The
Dual-Pneumatic atomizing system operates with air and water under
pressure - air at approximately 30 psi and water at approximately
32 psi. Air consumption is figured at 12 SCFM per 100 lbs. of water
atomized per hour. A safety factor of 20% should be added for any
potential line losses.
Operation is
fully automatic and controlled by humidistats. When the relative
humidity (RH) level drops below the setting on the control humidistat,
the contacts on the control humidistat close the circuit, opening
the solenoid valve on the air control section. As soon as pressure
builds up sufficiently to atomize, the air pressure switch closes
the circuit to the water solenoid valve, starting water flow. Water
can not flow without adequate air pressure. All valves close if
there is a power failure. The water solenoid will close if there
is an air compressor failure. |
|
When
the desired level of relative humidity is reached, the humidistat
breaks the circuit and all solenoid valves close, shutting off flow
of air and water to the heads. The three-way water solenoid bleeds
off the water pressure instantly allowing the water valve seat in
the head to close immediately, preventing any chance of dripping
or spitting. At the end of each cycle, the air pressure is allowed
to fall gradually to zero through the heads, blowing all water from
the mixing chamber of the heads. The stainless steel cleaning needle
connected to the diaphragm, cleans the water orifice of the heads
at the end of each ON cycle. By completely drying the mixing chamber
of each head, mineral buildup is prevented. This cleaning is so
effective that YEARLY maintenance is usually all that is required!
|