-
CUT
2 1/2" WIDE x 7 1/8" HIGH RECTANGULAR OPENING IN
DUCT AT DESIRED LOCATION SO THAT THE MANIFOLD IS CENTERED
VERTICALLY.
-
APPLY
BEAD OF BUTYL RUBBER CAULK OR EQUAL AROUND OPENING IF DESIRED.
-
INSERT
DISTRIBUTION TUBE IN OPENING WITH CONDENSATE PORT FACING "DOWN".
UNIT MUST BE PLUMB (VERTICALLY AT MOUNTING PLATE AND HORIZONTALLY
AT STEAM INLET) WITHIN 1/16" PER FOOT.
-
FASTEN
TUBE TO DUCTWORK WITH (8) CS-163 DRILL QUIKS (INCLUDED).
-
PLUMB
AS SHOWN.
-
MINIMUM
DUCT HEIGHT IS 12".
-
UNIT WEIGHT (IN LBS.):
CS-2105, CS-2107 = LENGTH OF DISTRIBUTION TUBE [IN FEET] +
2.50.
CS-2106, CS-2108 = (1.74 x LENGTH OF DISTRIBUTION TUBE [IN
FEET]) + 2.50.
-
CONSULT
FACTORY FOR MOUNTING UNITS OVER 8 FEET LONG.