
INSTALLATION NOTES
1. CUT
3 1/4" WIDE x ("X" MINUS 6") HIGH RECTANGULAR
OPENING IN DUCT AT DESIRED LOCATION SO THAT MANIFOLDS ARE CENTERED
VERTICALLY.
2. APPLY
BEAD OF BUTYL RUBBER CAULK OR EQUAL AROUND OPENING IF DESIRED.
3. INSERT
DISTRIBUTION TUBES IN OPENING WITH CONDENSATE PORT FACING "DOWN".
UNIT MUST BE PLUMB (VERTICALLY AT SUPPLY HEADER AND HORIZONTALLY
AT STEAM INLET) WITHIN 1/16" PER FOOT.
4. FASTEN
SUPPLY HEADER TO DUCTWORK WITH (6) CS-163 DRILL QUIKS (INCLUDED).
FOR UNITS OVER 3 FEET IN LENGTH, SUPPORT BRACKET MUST BE FASTENED
AT ONE POINT ON TOP AND BOTTOM. HARDWARE PROVIDED BY OTHERS.
THREADED ROD SUPPORT METHOD SHOWN IS ONE OPTION.
5. PLUMB
AS SHOWN.
6. TOTAL
UNIT WEIGHT (IN LBS.) IS APPROXIMATELY (6.28 x HEADER LENGTH
[IN FEET]) + (1.83 x LENGTH OF DISTRIBUTION TUBE [IN FEET] x
NUMBER OF TUBES)
7. CONSULT
FACTORY IF OTHER MOUNTING ARRANGEMENTS ARE NECESSARY.